Foshan, Guangdong, China
sylvia@fantancyhouse.com|WhatsApp +86 13923269474
Foshan · Production coordination

From Production Planning to Export Packaging

See how project information moves into manufacturing, inspection planning and shipment preparation at the Foshan operation. The exact sequence and checks depend on the confirmed order.

Discuss production and packing requirements
Supplied photograph of a workshop floor with window and door samples; specific production line not identified
Edited workshop view based on supplied imagery · order not identified

Each project is organized around the approved opening schedule, material choices, checks, protective packing and shipment destination. Workshop images show supplied or edited views and do not document a particular customer order.

FoshanOrigin
Project-ledTechnical coordination
Made to orderConfiguration per brief
Production flow

A repeatable brief creates a cleaner handoff

The exact sequence depends on the product and order. The following stages are a practical framework for a project conversation.

01Requirements

Receive product list, schedule, drawings, photos and destination.

02Technical review

Confirm system, opening, glass, hardware, finish and options.

03Production

Build against approved information and agreed change control.

04Inspection & packing

Discuss checking, protection, labels and loading before shipment.

Workshop, profiles and assembly

Read the materials and work area in context.

These edited views are based on supplied workshop photographs and show visible sample-handling activity. They do not identify an order, product series or specific production output.

Order-specific inspection planning

Agree the checks and records before production.

Inspection points and acceptance records depend on the selected product, approved drawings and purchase requirements. The photographs on this page do not establish a laboratory test, certificate or completed inspection result.

01

Approved information

Confirm the latest drawings, product schedule, finish and changes for the order.

02

Agreed inspection points

Define the checks, timing and acceptance criteria that apply to the selected assembly.

03

Records and packing

Confirm which photos, documents, labels and protection details are required before dispatch.

Protection and export handling

Plan protection, labels and loading with the order.

These edited views show warehouse staging and product protection as handling context only. They do not identify a customer, order, shipment or logistics performance.

Start with your opening schedule

Start with the opening schedule.

Share dimensions, quantities, drawings and destination for a product-specific review of system, glass and hardware options.