Foshan, Guangdong, China
sylvia@fantancyhouse.com|WhatsApp +86 13923269474
Destination market guide

Custom Windows & Doors for Australian Building Projects

Start with glazing safety, product selection, wind exposure and the documentation relevant to the intended installation and state or territory.

Prepare an RFQ

Fantancy House has supplied customers in Australia. We use that market experience to frame each enquiry, while confirming the selected system, documentation and local requirements for the individual project.

Project-specific review

Questions to resolve before specifying a system

These points help structure a conversation. They are not a code interpretation, product approval or compliance declaration.

01

Confirm the applicable NCC and local rules

Ask the building surveyor which NCC edition, state or territory variations and approval pathway apply to the project.

02

Verify window and glass requirements

AS 2047 and AS 1288 may be relevant to the selected glazed assembly. Confirm the applicable scope, evidence and exact product configuration with the project certifier.

03

Design for site exposure

Provide location, wind classification or design pressures, coastal exposure, drainage conditions and building height for project-specific review.

04

Select openings and shading together

Compare sliding, folding and casement options with clear opening, threshold, flyscreen, external shading and operation requirements.

05

Plan dimensions, packing and installation

Confirm unit sizes, access, packaging, site storage, installation sequence and the responsible local installer before production.

Official reference links

Use these sources to confirm the current rule for the project location and product configuration.

Australian National Construction Code NCC Volume Two glazing provisions reference
Prepare a project review

Send the location, schedule and performance brief

Market and code references do not confirm product compliance. Share the exact destination, opening list, drawings, glass and hardware requirements so the selected configuration can be reviewed.

Prepare an RFQ
Useful project inputsProject city, site exposure and delivery destinationOpening schedule with width, height and operationGlass, safety, solar and thermal targetsFinish, hardware, screens and installation interfaceDrawings, revision and requested evidence
Start with your opening schedule

Start with the opening schedule.

Share dimensions, quantities, drawings and destination for a product-specific review of system, glass and hardware options.

WA