Foshan, Guangdong, China
sylvia@fantancyhouse.com|WhatsApp +86 13923269474
Destination market guide

Project-Specific Aluminium Systems for European Buyers

Coordinate dimensions, glazing, security options and documentation with the destination country, intended use and the exact system configuration.

Prepare an RFQ

Fantancy House has supplied customers in Germany and France. We use that market experience to frame each enquiry, while confirming the selected system, documentation and local requirements for the individual project.

Project-specific review

Questions to resolve before specifying a system

These points help structure a conversation. They are not a code interpretation, product approval or compliance declaration.

01

Treat each destination country separately

EU construction-product rules provide a shared technical framework where applicable; national building rules and installation conditions remain relevant. Identify the country and project authority first.

02

Check the product route before requesting marks

CE marking and performance documentation depend on the applicable harmonised technical specification or assessment route and the product’s declared use. No CE, DoP or DoPC status is claimed for the products shown here.

03

Specify the opening and glass

Provide dimensions, operation, glass build-up, safety requirements, acoustic goals and solar-control targets for the intended building.

04

Ask for security evidence only when needed

For any required resistance class, including EN 1627-related claims, verify a current report or certificate for the complete tested assembly. A lock photograph or hardware option does not establish a class.

05

Coordinate the design and delivery set

Confirm drawings, tolerances, finish, hardware, packaging, delivery terms and installation interfaces for the selected country.

Official reference links

Use these sources to confirm the current rule for the project location and product configuration.

European Commission: Construction Products Regulation European Commission: CPR overview and scope European Commission: CE marking and DoP/DoPC
Prepare a project review

Send the location, schedule and performance brief

Market and code references do not confirm product compliance. Share the exact destination, opening list, drawings, glass and hardware requirements so the selected configuration can be reviewed.

Prepare an RFQ
Useful project inputsProject city, site exposure and delivery destinationOpening schedule with width, height and operationGlass, safety, solar and thermal targetsFinish, hardware, screens and installation interfaceDrawings, revision and requested evidence
Start with your opening schedule

Start with the opening schedule.

Share dimensions, quantities, drawings and destination for a product-specific review of system, glass and hardware options.

WA